Cortec Precision Sheet Metal

Cerris Builders worked with Cortec Precision Sheetmetal on their new manufacturing facility in Pflugerville, TX. This facility was originally planned as two buildings totaling 105,000 SF. Cerris Builders proposed replotting the lots into one lot. This decreased the overall construction cost and increased the overall building square footage to 120,000 SF. This change also allowed for a more efficient facility and decreased the overall construction cost. Construction consisted of 120,000 SF of load bearing tilt-up panels with clear height. Cerris Builders worked as the design-builder on this project with KAH Architecture, BSE Structural Engineers, and Clark Associates.

Pflugerville, TX // 119,000 SF // Cortec Precision Manufacturing // KAH Architecture and Interior Design // Design-Build